cristianmart29 cristianmart29
  • 04-04-2018
  • Computers and Technology
contestada

What action is often necessary when installing joists for a cantilever floor?

Respuesta :

idegollacion20
idegollacion20 idegollacion20
  • 14-04-2018
A cantilevered floor is a kind of floor that pops out past the foundation wall below.  Start the joist layout from the longest and strongest run the house or building has. You should also lay floor joists on the stairway's opposing side. Also, remember the 2/3 rule for framing cantilever joists. This means that twice the joist's length should remain inside the structure while the rest sticks out.
Answer Link

Otras preguntas

2(n-3)=4n+1 this sucks not knowing the answer
Given the inequalities y > 5x-8 and y >3x+4, find the point that satisfies both inequalities
A construction contractor is purchasing granite tiles for a new kitchen floor. Each tile costs $5 and he wants to spend less than $1,500. The size of each tile
how do I solve x+2y=8
In Romeo and Juliet act 2, which character serves as a messenger
I = {1, 2} List all possible subsets of the given set.
What do you mean by corrosion? How can you prevent it?
Question: 35/8 ( write as mixed number ) Please help me very very quickly!!!!!!!!!!!!!!!!!!!
Given the inequalities y > 5x-8 and y >3x+4, find the point that satisfies neither inequalities
among the qualities listed on the human relations scale, the most important one for the building new relationship is?