Respuesta :
The solution would be like this for this specific problem:
Bozeman: P(5) = 27,509
(1.0196) ^ 5 = 30,313
Butte: P(5) = 32,370 (0.9971) ^ 5 = 31,903
The solution would be like this for this specific problem:
Bozeman: P(5) = 27,509
(1.0196) ^ 5 = 30,313
Butte: P(5) = 32,370 (0.9971) ^ 5 = 31,903