Based on the given parameters of a = 1.7 cubic feet and concrete for first 4 steps as 17 cubic feet, the concrete is required for the first 12 steps is 132.6 cubic feet
Sn = n/2 {2a + (n - 1) d}
17 = 4/2{2×1.7 + (4 - 1)d}
17 = 2{3.4 + (3)d}
17 = 2(3.4 + 3d)
17 = 6.8 + 6d
17 - 6.8 = 6d
10.2 = 6d
d = 10.2/6
Concrete required for first 12 steps;
Sn = n/2 {2a + (n - 1) d}
= 12/2{2×1.7 + (12-1)1.7}
= 6{3.4 + (11) 1.7}
= 6(3.4 + 18.7)
= 6(22.1)
= 132.6
Concrete required for first 12 steps = 132.6 cubic feet
Learn more about sum of arithmetic progression:
https://brainly.com/question/24205483
#SPJ1