hayleyyamira hayleyyamira
  • 17-12-2021
  • Mathematics
contestada

It takes 5 men 20 days to paint Tom’s fence. How long should it take 4 men to paint the fence working at the same rate?

Respuesta :

meggstarnes meggstarnes
  • 17-12-2021
Maybe 24 cause 20 days divided by 5 is 4 so 4 days pretty person so yeah
Answer Link

Otras preguntas

Which set of cisco ios commands instructs the ips to compile a signature category named ios_ips into memory and use it to scan traffic?
Most transmembrane proteins have ___________ regions facing the intra- and extracellular fluid, and __________ regions embedded in the phospholipid bilayer.
Question 3 of 10 Which of these factors helped Germany annex Austria? OA. Austrian citizens felt an increasing sense of German nationalism before World War II.
The area of the square is 36 square cm. Find its side.
The MR = MC rule can be restated for a purely competitive seller as P = MC because:? 1 each additional unit of output adds exactly its price to total revenue. 2
6. How many grams are present in 13.2 moles of O₂?
In any collaboration, data ownership is typically determined by:
Given f(x) and g(x) = k⋅f(x), use the graph to determine the value of k. 3 1/3 -1/3 −3
Find the y-intercept. (2x + 1)(x + 7). (x + 3)(x + 4) y = ([?], all three would be pretty nice
it takes two painters 4 days to complete a job. How long does does 1 painter take for the same job?