If members of a project team report formally to a functional manager (not directly to the project manager) what type of organization is it

Respuesta :

tilermaelee
tilermaelee tilermaelee
  • 02-01-2021

Answer:

Matrix organization

Explanation:

Hope this was helpful! Have a good day

Answer Link

Otras preguntas

A 50kg football player heading to the right at 2.5 m/s collides with and tackles a 40kg player heading left at 3.5 m/s toward him. What is the speed and directi
How Do You Find Exponential Growth/Decay?​
Write the Two statements that form each biconditional. 1. The product of two numbers is a perfect square if and only if the two numbers are identical.
Who is the president of banjul
How do mental health experts diagnose clinical depression
What fraction of the energy from one trophic level carries up to the next trophic level?
plaints exchange gas in the atmosphere which statement is accurately describes this process​
Which of the following fruits is an example of a false fruit? A. Cashew B. Mango C. Pawpaw D. Pineapple ​
What is the residual condition?
Speech for should voting be compulsory or not???