Answer:
B-$878
Explanation:
The total cost of the truck $ 117,000 is allocated to Construction Site D on the basis of number of tons delivered to that Site.
The truck can deliver 200,000 tons over his expected useful life.
so the cost per ton is $117,000/200,000 = $0.585 per ton.
Number of tons delivered to Site D is 1,500 tons.
so the cost allocated to Site D is 1,500 tons × $0.585 = $878