Respuesta :
Answer:
7 hours and 55 minutes
Step-by-step explanation:
950 (garments) X 30=28,500 seconds = 475 minutes = 7 hours and 55 minutes
Answer:
7.9 hours required to tag all the garments
Step-by-step explanation:
First ... how many seconds would be required to tag all the garments?
Multiply (950 garments) by (30 seconds / garment), obtaining 28,500 seconds.
Since 1 hour = 3600 seconds, we get:
(28,500 seconds)(1 hr) / (3600 seconds)
or
7.9 hours required to tag all the garments