McPhee Company manufactures rugs in the cutting and assembly process. Rugs are manufactured in 70-rug batch sizes. The cutting time is 14 minutes per rug. The assembly time is 24 minutes per rug. It takes 18 minutes to move a batch of rugs from cutting to assembly. What is the value-added lead time?

Respuesta :

Answer:38 min

Step-by-step explanation:

Given

Cutting time [tex]t_1=14 min[/tex]

Assembly Line time [tex]t_2=24 min[/tex]

[tex]t_3=18[/tex] to move a batch of rugs from cutting to assembly

Value-added refers to a process or phase in a system that turns raw materials or work in progress into much more desirable goods and services for downstream consumers.

thus value added time is [tex]t_1+t_2=14+24 =38 min[/tex]                