Answer:
9800 N
Explanation:
The work done by the boulder is equal to the product between the force acting on it and the distance covered by the boulder:
[tex]W=Fd[/tex]
where
F is the magnitude of the force
d is the distance covered by the boulder
Here we know
W = 735,000 J is the work done
d = 75 m
Solving the equation for F,
[tex]F=\frac{W}{d}=\frac{735000}{75}=9800 N[/tex]
This force is actually equal to the force of gravity acting on the boulder, which is given by:
[tex]F=mg[/tex]
where
m = 1000 kg is the mass of the boulder
[tex]g=9.8 m/s^2[/tex] is the acceleration of gravity
Substituting,
[tex]F=(1000)(9.8)=9800 N[/tex]