Answer:
Explanation:
Giving the following information:
Visburg has the capacity to build 300 slabs and is presently working on 250 of them. Lancing is willing to pay only $3,300 per slab. Visburg estimates the cost of a typical job to include unit-level materials, $1,440; unit-level labor, $720; and an allocated portion of facility-level overhead, $1,200.
Unitary cost= 1440 + 720 + 1200= $3,360
Visburg shouldn't accept the special offer because it doesn't cover the variable costs. If you don't consider the facility-level overhead it is a good offer because it helps occupied the unused capacity.