Five routers are to be connected in a point-to-point subnet. between each pair of routers, the designers may put a high-speed line, a medium-speed line, a low-speed line, or no line. if it takes 100 ms of computer time to generate and inspect each topology, how long will it take to inspect all of them?

Respuesta :

Let assume are lettered A to E in that order. Thus, there will be 10 potential lines: AB, AC, AD, AE, BC, BD, BE, CD, CE and DE. Each of these potential lines has 4 possibilities. Therefore, the total number of topologies is 4¹⁰=1,048,576. 1,048,576. At 100ms it will take 104,857.6 seconds which is slightly above 29 hours to inspect each and one of them.