deonnatemple
deonnatemple deonnatemple
  • 19-03-2018
  • Mathematics
contestada

13.   There are 45 employees who each put in 97 hours on a project. What are the total number of hours worked on the project?

Respuesta :

mushy12mc
mushy12mc mushy12mc
  • 19-03-2018
you would do 45 x 97 which equals 4365
Answer Link

Otras preguntas

The hemisphere of radius r is made from a stack of very thin plates such that the density varies with height, r = kz, where k is a constant. Determine its mass
A line intersects the points (0,-4)and (1,2). What is the slope-intercept equation for this line?
which disease is common among smokers​
What caused trouble between Virginia’s farmers and Native Americans? forts pueblos missions communities
What equation results from completing the square and then factoring? x2 - 8x = 39 O A. (x-8)2 = 55 O B. (X-8)2 = 23 O C. (x-4)2 = 23 O D. (x-4)2 = 55
Geographically, a shield and surrounding platform together are ________. A. a low-lying region where Precambrian rocks crop out B. a low-lying region whe
what's 6 1/3 + 5 1/2 + 4 1/4=​
Which type of drug increases the activity of the body’s nervous system
Which definition is the best for “semipermeable membrane”?
An athletic coach conducted an experiment to test whether a four week strength training program will reduce the number of muscular injuries that occur during at