Beverly7520 Beverly7520
  • 01-03-2018
  • Social Studies
contestada

In the lean principles philosophy, unexpected downtime is the result of unreliable processes.

a. True

b. False

Respuesta :

Grace0424
Grace0424 Grace0424
  • 01-03-2018
I thinks the answer is true
Answer Link

Otras preguntas

what is the science name for table salt
In which sentence is the fraction written correctly? A. Jessie has finished one-quarter of her paper route. B. The hungry boy ate seven-eighths of the pizza.
If an organism that is homozygous recessive for a trait is crossed with a heterozygote, what is the chance of getting a homozygous recessive phenotype in the fi
In Mexico, Cinco de Mayo has been celebrated with A. decoration of trees. B. A formal dinner with the mayor. C. Parades and re-ennactments.
what molecule is known as the universal energy source of the cell
If x can be any number, how many solutions are there for the equation? y = 4x – 1 A. There are two solutions. B. There is no solution. C. There are many sol
Who led the Mexican men in the Battle of Puebla? A. General Pedro Ampudia B. General Mariano Paredes C. General Ignazio Zaragoza
Rome contributed to the development of world languages.
These were themes of Wilson's Fourteen Points speech EXCEPT (A) creation of an international organization (B) preservation of colonial inequities (C) freedom to
what does mutualism and commensalism have in common