Respuesta :

Search ResultsUse BFS to determine the length of the shortest v-w-path. Then use DFS to find thenumber of the v-w-shortest paths such that two nodes are connected and the length of path equals to the output of BFS. But the running time of this plan is O(m+n)+O(m+n). Also I've tried to modify the Dijkstra algorithm.
ACCESS MORE
EDU ACCESS