itstimmays9909 itstimmays9909
  • 20-10-2017
  • Business
contestada

​frito-lay production personnel obtain a sample every​ ______ minutes.

Respuesta :

LearnGrow
LearnGrow LearnGrow
  • 01-11-2017

Frito-Lay North America is the $11 billion convenient foods business unit of PepsiCo. Frito-lay production personnel obtain a sample every​ 45 minutes. Troubleshooting is made every 45 minutes. This means that every 45 minutes is checked If the production is fine and the quality of the product is checked.

Answer Link

Otras preguntas

a number decreased by 5 is less than 33
An octagon is blank that blank
what is true of a non-denominational activity
23.499 rounded to the nearest hundred
Mitch and his brother Austin started at their house and biked 8 kilometers west and 14 kilometers south. If they could take a straight diagonal route back home,
What is 1.5x minus 3y equals 6
An equilateral triangle and a square have the same perimeter. Each side of the square measures 6 cm. What is the length of each side of the triangle?
How many cups in a quart?
which of the following correctly relates the measures of the diameter(d) and radius(r) of a circle? 8 d=r/2 r=2d r=d/2 d=2/r
Select all that apply. Public service journalism _____. is a kind of reporting in which journalists act as an advocate of the public promotes the public welfare