shafisoomro10010 shafisoomro10010
  • 26-05-2024
  • Mathematics
contestada

If ten worker complete a work in 20 days how many workers are required to complete same work in 15 days

Respuesta :

isaac254971 isaac254971
  • 26-05-2024

Answer:

7

Step-by-step explanation:

Answer Link

Otras preguntas

estimate the product of 9.8*59.22
Tina has 1/2 of a pan of cornbread left from a dinner party she eats 1/2 of the leftover part the next night how much of the whole pan does Tina eat?
How are liquid assets different from other assets
What is a unit form of (2 tens 1 one) × 10 and standard form
what are square numbers what is a square root give an example of both?
A block of ice with mass mA rests on a wedge of ice with mass mB=7.93 kg that is cut so that the surface of the wedge makes an angle of 37.5 with the ground. Th
Escribe la frase con el pronombre que reemplaza el OBJETO INDIRECTO. Rewrite the entire sentence replacing the indirect object with an indirect object pronoun.
which conflicts are examples of external conflicts ?
4r−3=3(3r+4) what is the answer
choose the equation that completes the equation. 24 ÷ 6 + 20=A. 3(7+1)B. 2(7+1)C. 2(7+10D. 3(7+7)