shafisoomro10010 shafisoomro10010
  • 26-05-2024
  • Mathematics
contestada

If ten worker complete a work in 20 days how many workers are required to complete same work in 15 days

Respuesta :

isaac254971 isaac254971
  • 26-05-2024

Answer:

7

Step-by-step explanation:

Answer Link

Otras preguntas

why were moosons important to africa traders?
A theater company charges $9.50 per ticket for people of all age groups. If c represents the total number of children who bought tickets and a represents the to
Determine the volume of an object that has a mass of 455.6 g and a density of 19.3 g/cm3. (1cm3 = 1ml) select one: a. 18.5 ml b. 23.6 ml c. 42.4ml d. 31.2 ml
Maria claims that any fraction located between 1/5 and 1/7 on a number line must have a denominator of 6. Enter a fraction that shows Maria's claim is incorrect
Which article and section of the u.s. constitution outlines the manner of electing u.s. representatives?
Which compound has ionic bonding? A. Cl2 B. HF C. CaO D. NO2
You may ONLY ANSWER 1 PROMPT. Remember the following as you write: The President sets goals, writes plans, and outlines steps. Congress writes the laws and v
Which example illustrates an oligopoly market structure in early American history? A) Two cobblers in town control the shoe making business. B) All imports to
The death penalty may not be considered cruel and unusual punishment as long as
Use the four step process to find the slope of the tangent line to the graph of the given function at any point. F(x)= -10x^2+7x