glxbal9136 glxbal9136 20-02-2024 Mathematics contestada A floor with an area of 10 m² can be tiled by 3 workers in 8 hours. Work out how long it would take 4 workers to tile a floor that is 25 m² Assume that all workers can tile at the same rate.