Answer:
Work = 440 J
Explanation:
Here we need to calculate the work done, The formula to calculate the work done is given by,
Given that: If you applied a force of 200 Newtons to lift a box 2.20 meters above the floor.
Substitute the required values in the above formula,
Hence, the required work done is 440 J