crossontiffany7571 crossontiffany7571
  • 17-07-2017
  • Mathematics
contestada

A realty developer sell residential lots fir 4,000 per square meter plus a processing free of 25,000. one of the lots the realty developer is seling cost 625,000.

Respuesta :

denis2887
denis2887 denis2887
  • 17-07-2017
selling cost = (price * lots) + processing fee

625000 = ( 4000 * lots) + 25000
625000 - 25000 = 4000 * lots
600000 = 4000 * lots

lots = 600000 / 4000 = 150.
Answer Link

Otras preguntas

Kuma, the owner of a technology firm, needs to hire a new site manager. She has narrowed the list of applicants down to two candidates. The two applicants work
what is carrying capacity
For each of the following accounts indicate the effect of a debit or a credit on the account and the normal balance. Debit Effect Credit Effect Normal Balance
When a star goes from the main sequence to the red giant phase, it becomes larger rather than smaller. This is true because gravity is getting temporarily overp
I will give you a Brainly crown if it is right. Will you help me!! Just because I click six does not mean it is six
Identify the vertex of the graph tell weather it is minimum or maximum
What is twelve times twelve
Mussatto Corporation produces snowboards. The following per unit cost information is available: direct materials $12, direct labor $4, variable manufacturing ov
how to reduce soil loss from wind?
Supler Corporation produces a part used in the manufacture of one of its products. The unit product cost is $22, computed as follows: Direct materials $ 7 Direc