The contract between both of them is rescinded because of mutual mistake. It is because Mark and Dale, the parties of the contract, are both made a mistake about the estimation of the size of the truck. Although Dale and Mark have meeting of minds which is considered the contract to be valid but both they have made mistake, therefore, the contract is voidable.
I believe the answer is: Mutual mistake
Mutual mistake happen when all the parties involved in the contract both mistaken regarding the things or material within their contract, which make them able to re-consider the term of the contract or even renew it. This type of mistake usually occurs when the planning do not represent the actualisation on the field