During 2013, tanner manufacturing expected job no. 26 to cost $300,000 of overhead, $500,000 of materials, and $200,000 in labor. tanner applied overhead based on direct labor cost. actual production required an overhead cost of $280,000, $550,000 in materials used, and $210,000 in labor. all of the goods were completed. what amount was transferred to finished goods?