josephraven304 josephraven304
  • 27-12-2022
  • Engineering
contestada

an industrial plant load is rated at 2.8 mva at 0.7 pf lagging. if a capacitor bank rated at 3 mva is added to the load, the new overall power factor of the system is most nearly:

Respuesta :

Otras preguntas

what percent of 240 is 180?
What were the causes if instability in the West after World War 1
Find the area of the figure. Round decimal answers to the nearest tenth.
Is speed or velocity more helpful to a pilot?
One milliliter of water weighs one gram. Explain the relationship between the conversion.  Then draw a conversion chart to show the relationship between one mil
name 3 things the Egyptians brought back from nubia
why do think Thomas Paine originally published Commons sense anonymously?
One milliliter of water weighs one gram. Explain the relationship between the conversion.  Then draw a conversion chart to show the relationship between one mil
What were the causes if instability in the West after World War 1
what percent of 240 is 180?