naomioprea14
naomioprea14 naomioprea14
  • 27-02-2017
  • Mathematics
contestada

A manager has 2500kg of sand delivered to a construction site every day.
about how many tons of sand does he have delivered to the site after 4 weeks.

A. 2.5 tons
B. 19.3 tons
C. 77.2 tons
D. 324,000 tons

Respuesta :

captaincleanfreak
captaincleanfreak captaincleanfreak
  • 28-02-2017
C 77.2 tons for four weeks
Answer Link

Otras preguntas

In the chemical reaction between aqueous magnesium chloride and sodium metal, what chemical amount (mol) of magnesium metal can be precipitated (produced) with
Identify these stars of Indian cinema and write their names.12.3​
Evaluate if 8y + 4x – (2x + 3) if x = – 2 and y = 6
For questions 1-6, let U={0,1,4,9,16,25,36,49,64,81}, A={0,9,16,36,64}, and B={1,9,25,49,81}. Find A U Bthen Find B' then find |A|​
A Which expression is equivalent to the following complex fraction?
Which expression can be used to convert 22 Australian dollars to US dollars? Assume 1.2 Australian dollars equals 1 US dollar
CAN ANYONE SOLVE THIS QUICK!
Learning Task No. 2 Directions: Rewrite the three-paragraph descriptive essay below, check the punctuations and if there is a need to include any signal words,
please help me :(Any Maths Moderator:( please help me; I am in great trouble​
waht is civilization?​