Given,
Station A and Station B are 290 feet apart.
Tracks rise 8 feet.
We need to find the slope of the tracks, because the slope of the track is the gradient of the track.
The slope is rise over run.
The rise is "8"
The run is "290"
Hence, the slope is >>>>>
[tex]\frac{8}{290}\approx0.027586[/tex]To convert it to a percentage, we multiply by 100. Thus,
[tex]0.027586\times100\approx2.76\%[/tex]This is within the tolerance range of less than 3.5%.
So, this grade meets the rapid transit rail standards.