To determine the grade we first need to find the slope of the track, the slope is given by:
[tex]slope=\frac{rise}{run}[/tex]In this case, we know that the track rise 7 ft in a 300 ft run, then we have:
[tex]slope=\frac{7}{300}=0.023[/tex]Now that we know the slope we just multiply it by 100 to find the grade:
[tex]\begin{gathered} grade=100*(0.023) \\ grade=2.3 \end{gathered}[/tex]Hence the grade of the track is 2.3% and since this is less than 3.6% we conclude that this track meets the rapid-transit rail standards