Given:
Working together, it takes two computers 5 minutes to send out a company's email. If it takes the slower computer 15 minutes to do the job on its own
Let the faster computer has a rate of x emails per minute
And the slower computer has a rate of y emails per minutes
And let the total mails = z
When the two computers working together, the time taken to send the mails = 5 minutes
So,
[tex]x+y=\frac{z}{5}\rightarrow(1)[/tex]And the slower computer 15 minutes to do the job on its own
So,
[tex]y=\frac{z}{15}\rightarrow(2)[/tex]substitute equation (2) into equation (1)
[tex]\begin{gathered} x+\frac{z}{15}=\frac{z}{5} \\ x=\frac{z}{5}-\frac{z}{15}=\frac{2z}{15} \end{gathered}[/tex]So, the answer will be:
The faster computer will do the job in a time = 15/2 = 7.5 minutes