Respuesta :

The setup of equipment is a batch-level task in activity-based costing, each cost pool has its own fixed overhead rate, and activity-based costing is less expensive to implement than traditional costing. Activity-based costing enhances control over overhead costs.

What's the cost?

The term "cost" can refer to the cost of purchasing something or the sum that a business spends producing a good. It is the price that is put on anything in exchange for the good. Numerous variables and non-variable costs may be included in the incurred cost, including those for purchasing, labor, wages, rent, maintenance, raw materials, processing, packaging, and transportation.

The International Gems sell their product slots in this question. Three cost pools have been created for the shipping division. The inclusion of packaging and shipment, final inspection, and general operations will result in the final shipping costs.

To know more about cost pool visit here:

https://brainly.com/question/23071

#SPJ4

ACCESS MORE