The graph of the cost equation is shown in the image below.
Sadly, we don't have the options, but we know that the graph that you must identify is the graph related to the given cost equation.
So we can make that graph, so you can look at it and then identify which is the correct option.
We need to graph the line:
J(p) = 150 + 25p
To do so, you need to find two points in the line, to do that, just evaluate the function in two values of p.
if p = 0, then:
j(0) = 150 + 25*0 = 150
if p = 1
j(1) = 150 + 25*1 = 175
Then we have the pairs (0, 150) and (1, 175).
Now you can find these two points on the coordinate axis and just connect them with a line, and there you have the graph of the cost equation.
If you want to learn more about linear equations:
https://brainly.com/question/1884491
#SPJ1