17.5 Days can be covered if the shipment from the supplier is delayed.
Average demand, which is calculated by dividing the total number of kilowatt-hours by the number of units of time in the interval, is the demand for the electrical system or any of its components throughout a specific period of time with a long length.
35 items make up Jackson Collectibles' safety supply.
However, 14 units are needed each week.
The amount of weeks they may survive on safety stock as a result is:
= Weekly demand / safety stock
= 35 / 14
= 2.5 weeks
These are in days:
= 2.5 * 7
= 17.5 days