The cost of each bolt according to the task content is; 35c.
Since, there were 2500 bolts, it follows that there were 12500 nails.
The total cost of nail is therefore; 12500 × 5c. = 62500c = 625$.
Hence, the total cost of bolts is; 1500$ -625$ = $875 = 87,500c.
Consequently, the cost of each bolt is; 87,500c/2500 = 35c.
Read more on conversion;
https://brainly.com/question/97386
#SPJ1