A well is being dug. A 4.5-kg bucket is filled with 28.0 kg of dirt and pulled vertically upward at a constant speed through a distance of 9.0 m. Determine the work done on the filled bucket in raising out of the hole.

Respuesta :

The work done on the filled bucket in raising out of the hole is 2, 925 Joules

How to determine the work done

Using the formula:

Work done = force * distance

Note that force = mass * acceleration

F = mg + ma

F = 4. 5 * 10 + 28 * 10

F = 45 + 280

F = 325 Newton

Distance = 9m

Substitute into formula

Work done = 325 * 9

Work done = 2, 925 Joules

Therefore, the work done is 2, 925 Joules

Learn more about work done here:

https://brainly.com/question/25573309

#SPJ1