Variables to fill the blanks are mathematically given as
a)
F= 16
A= $ 6
S= $ 530
I= $ 270
b)
The speed boat is $ 59
The Bass Boat is $ 148
Generally, the equation for Fabrication is mathematically given as
[tex]F=\frac{Overhead \ Cost}{ Activity \ Base \ Usage \ Quantities}[/tex]
Therefore
[tex]F= \frac{448,000}{28,000}[/tex]
F= 16
Generally, the Assembly is mathematically given as
[tex]A= \frac{180,000}{30,000}[/tex]
A= $ 6
Generally, the Setup is mathematically given as
S= $ 222,600 / 420
S= $ 530
Generally, the Inspection is mathematically given as
[tex]I = \frac{189,000}{700}[/tex]
I= $ 270
b)
For the Activity-based factory overhead per unit
The speed boat is $ 59
The Bass Boat is $ 148
In conclusion, Use the values to fill in the required blanks
Read more about activity rates
https://brainly.com/question/5143419
#SPJ1