9 men
Step-by-step explanation:
If 6 men are required to complete a job in 8, than 9 men would be required for a 12 day job.
12-8=4 which is half of 8
Half of 6 is 3
6+3=9
Answer:
4 men
Step-by-step explanation:
• Let x be the number of men needed to do the work I need 12 days.
•• it’s clear that the two variables (number of men and number of hours are in inverse proportion)
•• Which means their product is always equal to a constant.
Therefore
12 × x = 6 × 8 = 48
Then
x = 48 ÷ 12
= 4