The chances are that the emission from the manufacturing unit is within the permissible level or not within the permissible level is 0.5525.
The term probability describes the chance that an event will occur. In this case, we know that the probability that the company is exceeding the permissible level is 0.35.
We also know that; probability that the carbon emission is within the permissible level is 1 - 0.35 = 0.65.
The chances are that the emission from the manufacturing unit is within the permissible level or not within the permissible level, hence; 0.65 x 0.85 = 0.5525.
Learn more about probability:https://brainly.com/question/1995859
#SPJ4