The total work is done by the weight lifter who lifts a mass m at constant speed to a height h in time t, is (mgh)/t.

What is work done to lift an object?

The amount of energy which is required to lift a object at a height is known as the work done of lifting an object.

The work done to lift an object for a time period of t is given as,

[tex]W=\dfrac{mgh}{t}[/tex]

Here, (m) is the mass of the object, (g) is the acceleration due to gravity and (h) is the height.

It is given that a weight lifter lifts a mass m at constant speed to a height h in time t. Thus, the work done by the weight lifter is,

[tex]W=\dfrac{mgh}{t}[/tex]

Hence, the total work is done by the weight lifter who lifts a mass m at constant speed to a height h in time t, is (mgh)/t.