Kelsea101 Kelsea101
  • 30-03-2022
  • Mathematics
contestada


A construction company takes
1/6 hours to remove 1/2
metric tons of dirt from a construction site.

What is the unit rate in metric tons per hour?
Write your answer in simplest form.

Relax

Respuesta :

gradyisabelle08
gradyisabelle08 gradyisabelle08
  • 30-03-2022

Answer:

3 tons per hour

Step-by-step explanation:

Since 0.5=1/6

you can multiply 0.5 by 6:

0.5x6= 3

With an ending result of 3 tons per hour

Answer Link

Otras preguntas

there are 192 students the ratio of students who do their homework to the students who don't is 6:2 - how many do their homework and how many do not
round 533,736 to the nearest thousand
how can i use inverse operations to write the related multiplication and division sentences???
how many times greater is a gigabyte than a megabytes
how can you tell whether a compound inequality involves AND or OR from lookinh at its graph
How do you think the role of the artist has changed any?
how can you use properties to solve 4×23×28
what is the relationship of the product of 12 and 20 to the product of the gcf and the lcm of the to numbers
what is the most important thing to remember about giving cpr
A giraffe can run up to 46.93 feet per second how far could a giraffe run in 1.8 seconds justify your answer