1. The average flow rate of an application is 11.3 days.
2. The number of applications that are rejected is 672.
3. The average flow time at Initial Review sub-process is 6.75 days
R = 800
I = inventory
= 180 + 60 + 60
= 300
I/R = 300/800
= 0.375 month * 30 days
= 11.3 days
The applications entering for A:
10 % of 800 = 80
The applications entering for B:
30% of 800 = 240
This shows that 60% are rejected
0.6 * 800 = 480
70% in A are accepted, so 30% x 80 = 24 are rejected for A
30% in B are accepted, so 70% x 240 = 168 are rejected for B.
Total number of rejected applications are 24 + 168 + 480
= 672
= I/R
I = 180
R = 800
180/800
= 6.75 days
Read more on average flow time here: https://brainly.com/question/15210930