A building under construction requires building materials to be raised to theupper floors by cranes or elevators. An amount of cement is lifted 76.2 m by acrane, which exerts a force on the cement that is slightly larger than the weightof the cement. If the network done on the cement is 1.31 × 103 J, what is themagnitude of the net force exerted on the cement?

Relax

Respuesta :

Answer:

17.19N

Explanation:

Work = 1.31 × 10³ = 1310

F = W/D = 1310/76.2

≈ 17.19N