mukulsingla004 mukulsingla004
  • 27-02-2022
  • Business
contestada

5) Explain the difference between value analysis and value engineering.

Respuesta :

galaxyalpaca227
galaxyalpaca227 galaxyalpaca227
  • 27-02-2022

Answer:

As cost avoidance or cost reduction before manufacturing, value engineering is strongly related to target costing. Value analysis is the process of avoiding or reducing the cost of a product that is already in production.

Answer Link

Otras preguntas

Bella is planning to write in a journal. Some pages will have one journal entry on them, and other pages will have two journal entries on them. If Bella wants t
15 is 75% of what?
Is the expression -12x-18 equivalent to the expression -6x-9-3(3-2x)
How is 47.3 divided by 1 tenth equal to the product 47.3 times 0.1
Which of the following sentences contains a verb in the present tense?                  A. Jessica enjoys running.B. We left early.C. They are walking around
what city is located on 35 degrees north and 135 degrees east
X=7y-9 X+7y=8 Need help using substitution. ?! Please
what is 350% as fraction
How would you use the word caginess in a sentence
15 is 75% of what?