The total cost of canvas required to make the tent at the rate of Rs. 15 per square meter is; Rs. 24,997
We are told that the bottom part of the tent house is a square cuboid up to a height of 10 m.
Thereafter, it is a pyramid.
Now, formula for volume of a cuboid is;
V = lwh
V = 20 * 20 * 10
V = 4000 m³
Formula for volume of a pyramid is;
V = lwh/3
V = (20 * 20 * h)/3
V = 400h/3
Total volume is 4800 of the entire tent house. Thus;
4000 + (400h/3) = 4800
400h/3 = 800
h = (800 * 3)/400
h = 6 m
Now, from online calculation, the surface area of the pyramid excluding the base is;
TSA_p = 466.48 m²
Total surface area of cuboid excluding the top is;
S.A = 1200 m²
Total surface area of canvas = 1200 + 466.48 = 1666.48 m²
Since cost per sq.m is Rs. 15 per m², then;
Total cost = 15 * 1666.48
Total Cost = Rs. 24,997
Read more about Total Cost at; https://brainly.com/question/25109150