pmg501nitty
pmg501nitty pmg501nitty
  • 18-02-2022
  • Mathematics
contestada

A construction company needs to remove 7 1/4 tons of dirt from a construction site. They can remove 5/6 tons of dirt each hour. What is the total number of hours it will take to remove the dirt? Write your answer as a mixed number in simplest form.

Respuesta :

vivekajesh
vivekajesh vivekajesh
  • 18-02-2022

Answer:

8  7/10    or 8.7

Step-by-step explanation:

Answer Link

Otras preguntas

Find the value of X A: 7 B: -7, 7 C: 49 D: -49, 49
Draw n-ethyl-3-methylpentanamide. draw your structural formula with all necessary hydrogen atoms.
It takes Shonda of an hour to dry one load of laundry in her dryer. How many hours will it take her to dry 7 loads of laundry?
I will give brainleist, rate, and thank. Answer both questions or you will be reported. Please answer both of the questions. Factor them out. The answer choic
please help i will mark brainlist if correct
What is behind the movement of blacks from rural to urban areas
How can a tree grow to be 90 meters (295 feet) tall using only light, water, and air
Which of the following activities does an effective team do?
To help World War II veterans transition back to civilian life, Congress
Which was not a response to the September 11 terrorist attacks on the United States?