a contactor hired 150 men to pave a road in 30 days.how many mem will be hire to do the same work in 20 days​

Respuesta :

kevinmario2008 kevinmario2008
  • 05-12-2021

Answer:375

Step-by-step explanation:W = RTN

1 = 1/7500(20)N

1 = 20/7500N

1 = 2/750N

750(1 = 2/750N)

750 = 2N

750/2 = N

375 = N

There are 375 men to do the job in 20 days

Answer Link

Otras preguntas

Cory's average score after 8 tests is 91%. If he gets a 78% on his 9th test what will his new average be? How do i figure out this problem?
write the ratio as a fraction in simplest form. 16ft to 6yd
a trapezoid has an area of 20cm squared and a height of 5 cm. what is the sum of its top and bottom sides
What is party-as-organization?
Is this a good thesis statement for my essay? The Earth has many life-threatening problems caused by humans. One of these problems is the over-consumption of w
who do scholars believe first wrote Beowulf
write the ratio as a fraction in simplest form. 16ft to 6yd
The empirical formula of styrene is CH; find the % composition for H and CH. How many atoms are present in a 2.00 gram sample of styrene? PLEASE HELP! THANK YO
A Coast Guard ship patrols an area of 125 square miles. The area the ship patrols is a square. About how long is each side of the square? Round your answer to t
During a windstorm, part of the top of a flagpole breaks off. The broken top portion touches the ground at an angle of 65degrees 14feet from its base. How tall