The standard cost for variable manufacturing overhead is computed the
same way as the standard cost for direct labor.
This is true as the both of them measure the degree to which a person works in an organization.This is usually measured by dividing the expected
manufacturing variable with the amount of time taken.
This also tells the amount of wages which an individual will receive usually at the end of the week or month.
Read more on https://brainly.com/question/25279292