Respuesta :
Net force = mass x acceleration. acceleration = force/mass = 500/200 = 2.5m/s^2. Power = work done/time. work done= force x displacement= 150x15 = 2250J. Power = 2250/5 = 450W.
Answer:
i. 2.5 m/s^2
ii. 450 watts
Explanation:
i. mass (M) = 200 kilograms and produces a force (F) = 500 N
From force is the product of mass and acceleration (F = M × A), how fast the car accelerates
A = F/M
A = 500/200
A = 2.5 m/s^2
ii, Time to move rock t = 5 sec
Distance d = 15 m
Force F = 150N
Power P is the rate of doing work. work W is said to be done when a force moves a body through a distance.
P =W/t
W = F × d
P = F × d/t = 150 × 15/5
P = 450 watts