mwakatebeasifiwe
mwakatebeasifiwe mwakatebeasifiwe
  • 16-10-2021
  • Physics
contestada

A steel bridge is built in several segment each 20m long , the gap between segment is 4m at 18°c .what is maximum temperature that the bridge can manage buckling​

Respuesta :

talandaher talandaher
  • 16-10-2021

Answer: The answer is The maximum temperature is 172°C

Explanation:

Answer Link

Otras preguntas

Round 1.8 to one decimal place
Mark has $186 in his savings account. He withdraws $94, deposits $56, and then withdraws $70. Find the balance of his account?
Find two numbers the exact answer is between. 3×567
Find the value of N N times $3.25 = $325.00
A customer buys 17.01 in gas and requests one five dollar $5 lottery ticket, two one dollar $1 lottery tickets, and one $3 lottery ticket. He gives you two winn
write a sentence with the words mission and hacienda to describe the life on the borderlands
Organize the following from largest to smallest: cell, tissue, nuclei, chromosomes, organs, genes, organ systems, organisms, DNA
Solve for x: −3| 2x + 6| = −12
How can nativism best be described? loyalty to old immigrants and discrimination against new immigrants loyalty to any immigrants that adapted to the American w
What is the sum of 7/10 and 11/30?