Victoriacaulder4
Victoriacaulder4 Victoriacaulder4
  • 04-10-2021
  • History
contestada

What are the risks involved in choosing to build within one kilometer of a site such as Teotihuacan?

Respuesta :

zarampa
zarampa zarampa
  • 04-10-2021

Answer:

Explanation:

The risk is the cancellation of construction due to the high possibility of an anthropological find.

Another risk is the protests of people who feel offended by an alleged invasion of an ancestral territory.

Answer Link

Otras preguntas

An equilibrium is not changed by a change in pressure. a. True b. False
15% is what percent of 75?
A search engine is a way to A. borrow reference books in the library. B. find information on the Internet. C. speak with a reference librarian. D. revise a rou
Headlines are an excellent way to tell a news story in just a few words. a. True b. False
In which decade did Martin Luther King, Jr., deliver his "I Have A Dream" speech? A. 1930s B. 1940s C. 1950s D. 1960s
The nitrogen utilized by most plants is derived from A. decayed organic matter. B. the atmosphere. C. soil. D. nitrogen gas.
Kenya has 2 hours to work a 100 problem math test. At what rate must she work in order to finish in 2 hours
What is 2/3 of 12348
The interdependence of body systems is essential because A. very few processes are controlled by hormones. B. all systems work together to maintain homeostasi
George said if 2 and 4 are factors of a number, then 8 is a factor of the number. Is he correct explain?