Marcus is a structural engineer assigned to the construction of a new recycling facility, along with an industrial engineer,
mechanical engineer, and architectural engineer, as well as a chief architect with two apprentices. Which of the
following project aspects is it most critical for Marcus to focus on?
O analysis of the machinery needed to run the facility
analysis of what systems are necessary to support the recycling process
O analysis of the load-bearing requirements of the facility
O analysis of how to best match the building plans to the facility work flow