The Lumber Division of Paul Bunyon Homes Inc. produces and sells lumber that can be sold to outside customers or within the company to the Construction Division. The following data have been gathered for the coming period:
Lumber Division:
Capacity200,000 board feet
Price per board foot$2.50
Variable production cost per bd. ft.$1.25
Variable selling cost per bd. ft.$0.50
Construction Division:
Board feet needed60,000
Outside price paid per bd. ft.$2.00
If the Lumber Division sells to the Construction Division, $0.35 per board foot can be saved in shipping costs.
If current outside sales are 130,000 board feet, what is the minimum transfer price that the Lumber Division could accept?
a. $1.25
b. $1.40
c. $1.75
d. $2.50

Respuesta :

Answer:

b. $1.40

Explanation:

The computation of the minimum transfer price that the Lumber Division could accept is shown below:

= Variable production cost per bd. ft. + Variable selling cost per bd. ft.

= $1.25 + $0.50

= $1.40

Hence, the minimum transfer price that the Lumber Division could accept is $1.40

Therefore the option b is correct

The minimum transfer price that the Lumber Division could accept is $1.40.

What is transfer price?

Transfer pricing is the method in which the product is sold out bey one subsidiary to another but within the company.

This method is used when the subsidiaries of a parent company are measured as separate earnings essences.

The computation of the minimum transfer price:

The minimum transfer price is found out by apply the formula:

[tex]\text{Minimum Transfer Price}= \text{Variable Production Cost per bd. ft.}-\text{Variable Selling Cost per bd. }[/tex]

According to the given case,

Variable production cost per bd. ft. = $1.25,

Variable selling cost per bd. ft. = $0.50.

Now apply the values in the above formula, we get:

[tex]\text{Minimum Transfer Price}= \text{Variable Production Cost per bd. ft.}-\text{Variable Selling Cost per bd. }\\\\\text{Minimum Transfer Price}= \$1.25 + \$0.50\\\\\text{Minimum Transfer Price}=\$1.40[/tex]

Therefore, the minimum transfer price that the Lumber Division to accept is $1.40. So, option D is correct.

Learn more about the transfer price, refer to:

https://brainly.com/question/4144684

ACCESS MORE