4 workers build a walk in 18 days . How many more workers should be added to build it in 12 days?

Respuesta :

dauyds
dauyds dauyds
  • 27-03-2021

Answer:

2

Step-by-step explanation:

figure it in "worker days"

4 builders times 18 days= 72 worker days

72 days/ 12= 6 workers

have 4 workers now, so you need 2 more

Answer Link
ranbeerpratapsingh
ranbeerpratapsingh ranbeerpratapsingh
  • 27-03-2021

Answer:

answer is 2

Step-by-step explanation:

hope it help you

Answer Link

Otras preguntas

Which of the following states is overrepresented by at least one seat in Congress?
Tiana has already cycled 17 kilometers this year, plus she plans to cycle 3 kilometers during each trip to work. How many trips will Tiana have to make to cycle
what are 5 important quotes in a thousand splendid suns
An apple is falling from a tree. Disregarding air resistance, which diagram shows the free-body diagram of the force or forces acting on the apple?
What chemical process produces the enormous amount of energy that comes to us from the Sun?
Which type of matter can only be separated by physical means?
Interstellar space is filled with radiation of frequency 160.23 GHz. This radiation is considered to be a remnant of the "big bang." What is the corresponding b
The temperature dropped 4°F one hour later. What is the current temperature if the temperature was 8°F one hour ago?
19 - 5 (2m - 3) + 9m = 36
3 coins are tossed simultaneously. what is the probability of getting 3 heads or 3 tails?