Answer:
1237 J
Explanation:
The work done by the hose on the balloon is the work done by a spring which is
W = 1/2k(x₀² - x₁²) where k = spring constant = 112 N/m, x₀ = 4.70 m and x₁ = 0 m.
Substituting the values of the variables into the equation, we have
W = 1/2k(x₀² - x₁²)
W = 1/2 × 112 N/m((4.70 m)² - (0 m)²)
W = 56 N/m(22.09 m² - 0 m²)
W = 56 N/m(22.09 m²)
W = 1237.04 J
W ≅ 1237 J